Sunday, October 12, 2025

Lion Gate of Mycenae WIP +1

Finished the left side wall. Used some pink foam to represent the natural stone at the base of it. 

After smoothing out some rough areas, will give it a coat of paint. Note, the end of the left side wall doesn't show stone work as the actual wall continued on a bit longer and sort of wrapped around to the right, following the contour of the hill the citadel was built upon. For a gaming scenario, figures can only enter the gate from the end of the terrain (i.e. they can manuever around it).
Frankenstein'd foam prior to spackling.
Thanks for visiting the blog, and hope you all are doing well!

3 comments:

  1. Some great progress. I admire your patience.

    ReplyDelete
  2. A far more dedicated hobbyist than I Mr. Dean, looking good. I have a friend that does these builds for me as I dislike making terrain unless I absolutely have to.

    Cheers
    Keviin

    ReplyDelete